CASE STUDY
Truck Terminal MSE Wall
Memphis, Tennessee
Project Number 2746
Prevent erosion issues before they start—reach out to Submar today!
Truck Terminal MSE Wall
Memphis, Tennessee
Existing Conditions
The Memphis truck terminal was built on two levels adjacent to the Mississippi River. The upper-level tanks are connected to the truck rack via two separate pipe racks running down a steep slope. The slope between the two levels was approximately 2:1 slope. Poor soil quality and sparse vegetation contributed to the erosion. The pipe rack footers eventually became undermined and threatened the integrity of the racks.
Solution
The slope was rebuilt using select backfill soils, a wire mesh facade, and a geogrid reinforcement system to stabilize the area. The design broke the long, steep slope into two separate slopes with a landing area in the middle. An internal drainage system was installed to convey drainage from the top half of the slope. A hydroseed mix of grasses and forbs was applied to the face of the wall to facilitate vegetative growth.
Project details
PROJECT #
2746
PROJECT Name
Truck Terminal MSE Wall