CASE STUDY

Dyer Ditch

Lake County, Indiana

Project Number 2050

Prevent erosion issues before they start—reach out to Submar today!

Dyer Ditch

Lake County, Indiana

BEFORE

Existing Conditions

A 50-foot wide pipeline right-of-way contained an 18-inch refined product pipeline. The 18-inch pipeline crosses Dyer Ditch between a railroad corridor and a residential area in Lake County, Indiana. Downcutting of the creek bed caused the banks to become steep and unstable; scour had developed a small span beneath the pipeline. The ditch banks and ditch bed are composed of clay. The banks were approximately 12 feet high and were well vegetated.

AFTER

Solution

The project area was dewatered and graded to yield stable slopes that are less susceptible to erosion. Fill was placed underneath and around the suspended pipeline. A geotextile material was placed atop the grade, followed by the Submar articulating concrete mat system which extends across the channel from bank to bank.

The mat 'tail' on the downstream end will protect the pipeline from headcuts that may try to move upstream through the ROW. Submar’s articulating concrete mat system will provide and maintain cover over the pipeline in the matted area.

Project details

PROJECT #

2050

PROJECT Name

Dyer Ditch

PROJECT Location

Great Lakes Region

Lake County, Indiana

PROJECT CATEGORY

Download

Related Case Studies

  • Mad River

    Montgomery County, Ohio

  • Volga River

    Fayette, Iowa

  • Buffalo Creek

    Beckham County, Oklahoma

Request a Quote

Don’t wait for erosion to cause costly damage—Submar provides effective solutions. Reach out today for a free consultation and tailored project quote.

Contact Form