Existing Conditions
An 8-inch diameter propane pipeline crosses Panther Run in Rockton, PA. All-terrain vehicle (ATV) traffic had created several small streams over the pipeline. The channel bed of Panther Run had degraded, and the banks had begun to migrate, leaving the pipeline exposed for approximately 12.5 linear feet. If left uncovered and unprotected, the pipeline risked further exposure and potential damage due to continued erosion.
Solution
Submar restored cover and protection to the pipeline while also remediating the pipeline right-of-way through various erosion control methods. Waterbars (or earthen berms) were created on the banks to redirect flow from the pipeline to a stable discharge point, and rock-lined swales were constructed to prevent further erosive scour. Upon completion of the final grading, erosion control blanket was placed on the banks. In the stream, rock shield was wrapped around the exposed section of the pipeline to protect it from abrasion.
A series of rock cross vanes was constructed to provide a means to step down to the eroded existing bed elevation while decreasing stream velocity near the banks and increasing the energy in the center of the channel. Cross vanes also improve stream habitats. All remaining disturbed stream banks were stabilized with seed and erosion control blanket, and boulders were placed in the project area to deter ATV traffic.
Project details
PROJECT #
12390
PROJECT Name
Panther Run
Request a Quote
Don’t wait for erosion to cause costly damage—Submar provides effective solutions. Reach out today for a free consultation and tailored project quote.