A 50-foot wide pipeline right-of-way contained one 8-inch diameter pipeline inside of a 10-inch casing. The pipeline was exposed across the entire 130-foot Mad River crossing in Montgomery County, Ohio. The pipeline was also suspended over a 5-foot deep by 30-foot long scour hole.
Caitlin Stroud2026-09-02T20:41:16+00:00
Happy Labor Day!
Caitlin Stroud2026-09-02T20:41:16+00:00September 7th, 2026|



