A 50-foot-wide pipeline right-of-way (ROW) had one 16-inch diameter natural gas pipeline in Lea County, New Mexico. Two sites, located 400 yards apart on the same pipeline, were being eroded directly over the pipeline ROW trench. Water running along the trench...
Caitlin Stroud2026-09-02T20:41:16+00:00
Happy Labor Day!
Caitlin Stroud2026-09-02T20:41:16+00:00September 7th, 2026|



