Holly Creek crosses a 30” gas transmission pipeline at nearly a 45° angle. The pipeline has a concrete cap poured on top to provide cover. The creek bed has degraded downstream of the pipeline, and the pipeline is exposed along the left bank.
Caitlin Stroud2026-09-02T20:41:16+00:00
Happy Labor Day!
Caitlin Stroud2026-09-02T20:41:16+00:00September 7th, 2026|



