Submar Mats Put to Use

Submar Mats Put to Use

Before Submar installation.

After Submar installation.

Pipeline exposure due to wind and water erosion remediation is a key service provided by Submar, Inc. In this case a 24-inch diameter pipeline in Virginia was exposed due to soil degradation in the bed of the channel. Submar installed a system of articulating concrete block revetment mattresses, (ACB’s), rock, and an erosion control blanket in order to cover and protect the pipeline. Here are the before and after images documenting how Submar addresses these issues to work in synergy with nature. For more case studies visit the Submar Projects page.