CASE STUDY

Unnamed Wash

New Mexico

Project Number 13500

Prevent erosion issues before they start—reach out to Submar today!

Unnamed Wash

New Mexico

BEFORE

Existing Conditions

A 15-foot deep erosion rill had formed in an unnamed wash due to storm water flows, exposing one of four natural gas pipelines in the area. If left uncovered and unprotected, the pipeline risked further exposure and potential damage due to continued erosion.

AFTER

Solution

In order to restore cover to the exposed pipeline and stabilize the soils, Submar constructed a mechanically stabilized earth (MSE) wall with a drop structure. The project area was excavated and graded as necessary; the crew began building the MSE wall using grading stakes, welded wire baskets, soil reinforcements, Miramesh, gabion stones, and Miragrid. Within the sequence of building the MSE wall, a drop structure with a vortex diffuser was constructed with a 24-inch diameter drainage pipe within the left-descending bank to convey sheet flow from the high bank to the unnamed wash.

A 12-foot by 12-foot concrete pad was installed around the pipe inlet. A 3-foot deep subgrade rock grade control was installed at the bottom of the culvert outlet to prevent storm flow from eroding the bed of the channel.

Project details

PROJECT #

13500

PROJECT Name

Unnamed Wash

PROJECT Location

Midwest Region

New Mexico

PROJECT CATEGORY

Download

Related Case Studies

  • Mad River

    Montgomery County, Ohio

  • Four Corners Arroyo

    San Juan County, New Mexico

  • Volga River

    Fayette, Iowa

Request a Quote

Don’t wait for erosion to cause costly damage—Submar provides effective solutions. Reach out today for a free consultation and tailored project quote.

Contact Form

This field is for validation purposes and should be left unchanged.