CASE STUDY

Delaware Basin

Lea County, New Mexico

Project Number 17891

Prevent erosion issues before they start—reach out to Submar today!

Delaware Basin

Lea County, New Mexico

BEFORE

Existing Conditions

A 50-foot-wide pipeline right-of-way (ROW) had one 16-inch diameter natural gas pipeline in Lea County, New Mexico. Two sites, located 400 yards apart on the same pipeline, were being eroded directly over the pipeline ROW trench. Water running along the trench degraded the depth of cover on top of and adjacent to the pipeline at both sites. This created two long pipeline exposures immediately adjacent to the access roadway. Trenches that were backfilled with existing material and rip rap, and final grading was performed.

AFTER

Solution

The objectives were to armor and protect the pipeline, and to prevent future erosion of the berm. The following solution was implemented to achieve these objectives at both sites:

The site was graded, anchor trenches were dug, and geotextile fabric was placed on top of the grade. A Submar articulating concrete mattress system was installed over the geotextile fabric and the mats were banded together. A total of 67 mats were installed at the two sites.

The upstream, downstream, and flank edges of the mat system were toed into excavated anchor trenches that were backfilled with existing material and rip rap, and final grading was performed.

Project details

PROJECT #

17891

PROJECT Name

Delaware Basin

PROJECT Location

Midwest Region

Lea County, New Mexico

PROJECT CATEGORY

Download

Related Case Studies

  • Mad River

    Montgomery County, Ohio

  • Four Corners Arroyo

    San Juan County, New Mexico

  • Volga River

    Fayette, Iowa

Request a Quote

Don’t wait for erosion to cause costly damage—Submar provides effective solutions. Reach out today for a free consultation and tailored project quote.

Contact Form

This field is for validation purposes and should be left unchanged.