Click on the image below to see the digital assets of your project
Enterprise Job #15084
Basemap of ROW from Mile 125-127
Location:
GPS:
Row:
Soil (Bed and Banks):
Date:
Read More
Wink Pipeline MP 102.2
GPS: N31.846509°, W104.751512°
The total span is approximately 70’
The A-frame support on the west bank is near the edge of a steep slope. Future erosion will destabilize the foundation
The 4 leg A-frame support is located 15’ from each bank. A 1 1⁄2” 6×19 wire rope is anchored into the ground 10’ further behind each A-frame. The pipe is suspended near the mid span from the wire rope spanning between the A-frames
The foundation system of the A-frame supports are unknown
The method in which the cable is anchored to the earth is not known