Four Corners – New Mexico – Case Study

Blog | Submar

Four Corners – New Mexico – Case Study

THE Exposed Pipeline Remediation Experts Submar Case Study – In our latest case study, discover how Submar protected a 16-inch diameter crude oil pipeline with a 10 foot long exposure where rainfall had carved a deep arroyo through the silty and sandy sediment of San Juan County, New Mexico. Submar offers comprehensive turnkey solutions for

Read More...

Delaware Basin – New Mexico – Case Study

THE Exposed Pipeline Remediation Experts   Submar Case Study – In our latest case study, discover how Submar protected a 16-inch diameter natural gas pipeline that was exposed for a total 650 feet at two locations in the Delaware Basin of Lea County, New Mexico.   Submar offers comprehensive turnkey solutions for onshore and offshore

Read More...

Exposed Pipeline Remediation – New Mexico – Case Study

Submar is the leader in exposed pipeline remediation, pipeline erosion control, and streambank stabilization. This project contained a crude oil pipeline that became exposed in a deep arroyo formed by fast-flowing water in an arid and sandy region of San Juan County, New Mexico. Listen as our Construction Superintendent explains the scope of this project. https://lnkd.in/gPCxabxT

Read More...

Submar enjoyed being a Hospitality Sponsor at the Louisiana Pipeliners Association Scholarship Golf Tournament. We had a great time serving and meeting all of the teams as they played through our hole.

Read More...

Big Swamp Creek – Mississippi – Case Study

Case Study – Read this case study to learn how Submar deployed our turnkey erosion control services to protect two 36-inch pipelines that cross Big Swamp Creek in Covington County, Mississippi. Submar offers comprehensive turnkey solutions for onshore and offshore pipeline protection, erosion control, and streambank stabilization for the pipeline industry. Our services include site

Read More...

Las Huertas Creek – New Mexico – Case Study

This case study describes how Submar deployed our turnkey erosion control services to protect a 30-inch natural gas pipeline that crosses Las Huertas Creek in Sandoval County, New Mexico. Submar offers turnkey solutions for onshore and offshore pipeline protection, erosion control, and streambank stabilization for the oil and natural gas pipeline industry. Our services include

Read More...

How to Prevent Bank Erosion

The force of water against banks can cause erosion by dislodging soil particles. If a pipeline crosses a stream with eroding banks, the line is susceptible to exposure and damage if the erosion issue is not addressed. What is LPSTP? A common method of bank stabilization is longitudinal peaked stone toe protection (LPSTP), which was

Read More...

Horizontal Directional Drilling (HDD) Alternative

Many solutions exist to mitigate depth of cover issues or exposed pipelines; however, some are more efficient and cost-effective than others. Let’s compare two of the most common solutions for establishing adequate cover over pipelines: horizontal directional drilling and articulating concrete mats. What is Horizontal Directional Drilling? Horizontal directional drilling (HDD) is a trenchless method

Read More...

Offshore Mats

Discovery Channel Show Oil, Sweat, and Rigs: Submar articulated concrete revetment mats installed subsea in the Gulf of Mexico. Another job well done for the leader in on and offshore pipeline exposure remediation.

Read More...