2024 STREAMBANK TRAINING

#pipelineintegrity | Submar

CADDO CREEK – OKLAHOMA – CASE STUDY

THE Exposed Pipeline Remediation Experts Submar Case Study – In our latest case study, discover how Submar protected a natural gas pipeline that was exposed due to lateral migration and headcutting at Caddo Creek in Carter County, Oklahoma. In addition to installing a Submar articulating concrete mat system, we also installed a Longitudinal Peaked Stone

Read More...

2024 Streambank Workshop

The 2024 Streambank Workshop, presented by Submar, will be held on February 20-21, 2024 at the Hilton Garden Inn Downtown/Convention Center in Nashville, TN. Dr. Freeman, a Ph.D. and Professional Engineer, will be the keynote speaker who will deliver the training. Topics will include fluvial geomorphology, sediment deposition, channel evolution, stream stability techniques, and pipeline

Read More...

Augmented Reality Erosion Simulation

THE Exposed Pipeline Remediation Experts Watch our Environmental Manager, Marcel Estay, demonstrate how a precipitation event can cause river bed and bank erosion using our augmented reality simulator. He further explains how this event can expose pipelines that cross under the river, and how Submar can remedy the situation by installing a long-term engineered solution

Read More...

Texas 811 Damage Prevention Summit

We enjoyed connecting with our customers at the Texas 811 Damage Prevention Summit in Georgetown, Texas. THE Exposed Pipeline Remediation Experts – Submar offers comprehensive turnkey solutions for onshore and offshore pipeline protection, erosion control, and streambank stabilization for the pipeline industry. Our services include site inspection and surveying, environmentally conscious engineered designs, environmental permitting

Read More...

Lake Sakakawea – North Dakota – Case Study

THE Exposed Pipeline Remediation Experts – In our latest case study, discover how Submar protected seven pipelines with 1600 feet of exposures, low depth of cover, and shoreline erosion over a 2.3 mile crossing at Lake Sakakawea in McKenzie and Williams Counties, North Dakota. Submar offers comprehensive turnkey solutions for onshore and offshore pipeline protection,

Read More...

West Fork San Jacinto River Tributary – Texas – Case Study

THE Exposed Pipeline Remediation Experts Submar Case Study – In our latest case study, discover how Submar protected four pipelines (owned by multiple operators) with long exposures due to rainfall events and downstream sand excavation that had caused extreme headcutting and lateral migration across the ROW in Montgomery County, Texas. Submar offers comprehensive turnkey solutions

Read More...

Four Corners – New Mexico – Case Study

THE Exposed Pipeline Remediation Experts Submar Case Study – In our latest case study, discover how Submar protected a 16-inch diameter crude oil pipeline with a 10 foot long exposure where rainfall had carved a deep arroyo through the silty and sandy sediment of San Juan County, New Mexico. Submar offers comprehensive turnkey solutions for

Read More...

Delaware Basin – New Mexico – Case Study

THE Exposed Pipeline Remediation Experts   Submar Case Study – In our latest case study, discover how Submar protected a 16-inch diameter natural gas pipeline that was exposed for a total 650 feet at two locations in the Delaware Basin of Lea County, New Mexico.   Submar offers comprehensive turnkey solutions for onshore and offshore

Read More...