CADDO CREEK – OKLAHOMA – CASE STUDY

CADDO CREEK – OKLAHOMA – CASE STUDY

THE Exposed Pipeline Remediation Experts

Submar Case Study – In our latest case study, discover how Submar protected a natural gas pipeline that was exposed due to lateral migration and headcutting at Caddo Creek in Carter County, Oklahoma. In addition to installing a Submar articulating concrete mat system, we also installed a Longitudinal Peaked Stone Toe Protection (LPSTP) system to prevent future toe scour and bank erosion.

Submar offers comprehensive turnkey solutions for onshore and offshore pipeline protection, erosion control, and streambank stabilization for the pipeline industry. Our services include site inspection and surveying, environmentally conscious engineered designs, environmental permitting and regulatory compliance, product design and manufacturing, project management and construction, and post-construction monitoring.