Once a pipeline becomes exposed, its chances for failure increase. Fortunately, pipeline accidents are extremely rare. Pipeline companies undertake many prevention and safety measures to ensure the integrity of their pipeline systems. A particularly dangerous situation can occur if an underground pipeline is exposed due to erosion; that’s where Submar comes in.
Big Blue River, Indiana
At Big Blue River in Indiana, a 10-inch diameter natural gas pipeline became exposed. A headcut, which is an abrupt drop in the bed of the channel, developed in a small drain that flows in to Big Blue River. This headcut exposed the pipeline for approximately 11 feet and suspending it for approximately 12 feet. If left uncovered and unprotected, the pipeline risked further exposure and possible damage due to unchecked pipeline erosion.
The Submar Solution
Submar armored the pipeline with Submar mats, a system of articulating concrete revetment mattresses, installed subgrade rock grade control and riprap, and placed erosion control blanket in order to guard against pipeline exposure.
- First, the project site was graded as necessary, with fill material covering the exposed section of the pipeline.
- A woven geotextile material was placed atop the grade, followed by the installation of the Submar mat system. The mats currently extend across the tributary from bank to bank. The edges of the mat system toe in to excavated anchor trenches that are backfilled with either rock or onsite material.
- On the downstream end of the mat system, a 3-foot deep by 10-foot long subgrade rock grade control was installed to prevent headcutting from progressing upstream, and riprap was placed on the banks to prevent pipeline erosion.
- Upon completion of the final grading, erosion control blanket was placed atop the grade.